Cadent are carrying out essential gas maintenance in the road to replace old iron gas mains with more durable plastic pipes. This is to ensure they continue to provide safe and reliable gas supplies to local businesses and residents.

As such there will be traffic control (in the form of two-way signals) on Old Station Road between the 18th March and 8th April.

For more information click here: https://roadworks.org/?111824537